Fitting Tube, Shaft And Propeller
Sign in to track this film in your collection or want list.
✎ Suggest a correctionDemonstrates the installation of the stern tube and the tail shaft. Shows how the propeller is swung into position and lined up, how the fairwater cap and rope guard are installed and how the tail-shaft assembly is secured for launching.
Related films
Sources
- A-V Online (National Information Center for Educational Media). CD-ROM database of educational and documentary media, compiled and maintained by the National Information Center for Educational Media (NICEM). — title, creator, length, format, sound, description
- 16mm Filmography (legacy record) — catalog record
- usgov-av-1974 — title, year, creator, length, color, sound, description
Original permalink · Record added 2023-02-27 02:32:36 · Suggest a correction