| 1944 |
Fine Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of U. S. Department of the Navy |
44 frames |
Filmstrip |
|
|
| 1944 |
First Aid for Non-Battle Injuries |
U.S. Department of the Army |
29 min |
16mm |
|
|
| 1944 |
Fitting Tube, Shaft And Propeller |
U S Office Of Education |
29 min |
16mm |
B&W |
sound |
| 1944 |
Flying The P - 61 Series Airplane |
U S War Dept U S Army Air Forces |
|
16mm |
|
sound |
| 1944 |
Fore Poppets and Internal Shoring |
Construction U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Forging a Deck Socket Wrench |
U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1944 |
Fundamentals of Artillery Weapons. |
Part 2: Types and Components of Carriage U.S. Department of the Army |
|
16mm |
|
|
| 1944 |
General Motors Diesel Engine Unit |
Injectors: Disassembly and Reassembly Model 278 U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
General Motors Diesel Engine Unit |
Injector: Maintenance U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
General Sheet Metal Practice |
U.S. Bureau of Mines in cooperation withAluminum Co. of America |
21 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
The Elliott-Buchi Turbocharger for Diesel Engines: Disassembly same U.S. Department of the Navy |
20 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Engine Reassembly. Part 2 U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
1-b; LST U.S. Coast Guard |
10 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Reconditioning Convalescents for Return to Duty U.S. Department of the Army |
37 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Wing Assembly: The Inboard Panel U.S. Office of Education |
19 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Sawing an Internal Irregular Shape U.S. Office of Education |
43 frames |
Filmstrip |
|
|
| 1944 |
Gracias Amigos |
U.S. Office of Inter-American Affairs |
|
16mm |
B&W |
sound |
| 1944 |
Grinding a Plain Pin. Part 1: |
Grinding Wheel U.S. Office of Education |
41 frames |
Filmstrip |
|
|
| 1944 |
Grinding a Plain Pin. Part 1: The |
Grinding Wheel U.S. Office of Education |
17 min |
16mm |
|
|
| 1944 |
Grinding a Slender Shaft With a |
Back Rest U.S. Office of Education |
29 frames |
Filmstrip |
|
|
| 1944 |
Grinding A Slender Shaft With Back Rest |
Division of Visual Aids U.S. Office of Education (Producer) Federal Security Agency (Producer) Emerson Yorke Studio (Producer) |
600 |
16mm |
B&W |
sound |
| 1944 |
Grinding A Taper |
U S Office Of Education |
19 min |
16mm |
|
sound |
| 1944 |
Griscom-Russell, How It Works. Part |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
GUIDED |
U.S. Office of Education |
28 min |
16mm |
|
|
| 1944 |
Hardness Testing - Rockwell |
U S Office Of Education |
18 min |
16mm |
B&W |
sound |
| 1944 |
Hatch Canopy. Part 2: Layout |
U.S. Department of the Navy |
25 min |
16mm |
|
|
| 1944 |
Highballing To Victory |
U.S. War Department |
|
16mm |
B&W |
sound |
| 1944 |
How To Fly the B-25 |
U.S. Department of the Air Force |
|
16mm |
|
|
| 1944 |
ICTURES 75 |
same title, also available. (OE 82; 17 minutes) 32, 41 2: Grinding a Straight Hole U.S. Office of Education |
17 min |
16mm |
|
|
| 1944 |
ILMSTRIPS 267 |
Manual Cutting a Bevel: Freehand U.S. Office of Education |
45 frames |
Filmstrip |
|
|
| 1944 |
Improving the Job |
U S Office Of Education |
300 ft. |
16mm |
|
|
| 1944 |
Innerbottom Sections Subassembly: |
of a Closed Floor; Subassembly of an Open Floor U.S. Office of Education |
42 frames |
Filmstrip |
|
|
| 1944 |
Inspection Method. Part 2 |
U.S. Department of the Navy with cooperation of U.S. Office of Education |
|
16mm |
|
|
| 1944 |
Inspection of Minor Assemblies |
U.S. Office of Education |
16 min |
16mm |
|
Sound |
| 1944 |
INSPECTION OF SHEET METAL PARTS |
U.S. Office of Education |
20 min |
16mm |
|
Sound |
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
58 frames |
Filmstrip |
|
|
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
58 frames |
Filmstrip |
|
|
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
37 frames |
Filmstrip |
|
|
| 1944 |
Introduction to Valves |
U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1944 |
Isolation |
Technique U.S. of the Navy |
|
16mm |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 2: Laying Off Bulkheads U.S. Office of Education |
15 min |
16mm |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 1: Running a Temporary Line U.S. Office of Education |
32 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 2: Laying Off Bulkheads U.S. Office of Education |
25 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 3: Running a Permanent Line and Boring U.S. Officeof Education |
58 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 4: Fitting Tube, Shaft, and Propeller U.S. Office of Education |
58 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern Tube, Tail Shaft, and Propeller. Part 3: Running a Permanent Line and Boring |
U.S. Office of Education |
32 min |
16mm |
|
|
| 1944 |
Laying Out, Drilling, and Tapping |
Flanges on Sea Chest U.S. Office of Education |
28 frames |
Filmstrip |
|
|
| 1944 |
Learning To Swim. |
U.S. Coast Guard |
|
16mm |
B&W |
sound |
| 1944 |
Lighting Off |
U.S. Department of the Navy |
39 min |
16mm |
|
|
| 1944 |
Loran: Airborne Operations |
U.S. Department of the Navy |
|
16mm |
|
|