SIDE SUB-ASSEMBLY OF A WEB FRAME

Produced by US Office of education. Presents in considerable detail the work of a shipfitter in sub-assembling a side frame. Views of a ship model with animation, serve to show and explain the smooth tapering surface of a streamlined hull and the role of side frames in holding the ship in shape. A detailed explanation is given of the reversing of templates in laying off pairs of frames. Attention is called to the fact that when unusual pressure and strain are to be counteracted the web frame is used.
Complete catalog record
Series: Shipbuilding skills series
Dewey number: 623.8
Audience level: sh-c-trade-adult Guide
Format/cost: 16-sd-$25.17
Distributors / rental: Bell & Howell Company $25.17 rent; Wilfred Naylor; $1.50; Ohio Department of Education; University of California $1.50; A. H. Rice and Company; Calhoun Company; Sunray Films Company; Dayton Film Rental Libraries; University of Texas $3; Visual Art Films $25.17; University System of Georgia, Division of General Extension $1; Ideal Pictures Corporation $1

More in Shipbuilding Skills Series

  1. BULKHEAD: LAYING OFF AND FITTING A CENTERLINE STIFFENER 1942
  2. BULKHEAD: SETTING TRANSVERSE WATERTIGHT BULKHEAD INTO HULL 1942
  3. DECK GIRDERS: SUB-ASSEMBLY 1942
  4. Deck Plates - Regulating And Setting 1942
  5. INNERBOTTOM SECTION: SETTING UP FLOORS AND LONGITUDINALS 1942
  6. INNERBOTTOM SECTION: SUB-ASSEMBLY OF A CLOSED FLOOR; SUB-ASSEMBLY OF AN OPEN FLOOR 1942
  7. PREPARING AND SETTING A KEEL BLOCK AND BOTTOM CRADLE 1942
  8. Side Frames - Subassembly Of A Web Frame 1942
  9. SIDE SUB-ASSEMBLY OF A WEB FRAME 1942
  10. The Deck - Setting A Web Frame And A Transverse Beam 1942
  11. Aligning And Installing Auxiliary Machinery. 1943
  12. BENDING COPPER TUBING TO A WIRE TEMPLATE 1944
  13. BRAZING FLANGES WITH SILVER SOLDER 1944
  14. BRAZING FLANGES WITH SPELTER 1944
  15. Covering Hot And Cold Pipes 1944
  16. Cutting and threading pipe by hand. 1944
  17. Cutting And Threading Pipe On A Power Machine 1944
  18. FILING AND INSTALLING CHOCKS 1944
  19. HOW TO CHECK AND SURFACE FOUNDATIONS 1944
  20. INSTALLING VALVES AND STRAINER ON SEA CHEST 1944
  21. LAYING OUT, DRILLING AND TAPPING FLANGES ON SEA CHEST 1944
  22. MAKING A COLD BEND ON A HAND POWERED MACHINE 1944
  23. MEASURING PIPE, TUBING AND FITTINGS 1944
  24. Pipe Fabrication With Jigs 1944
  25. Simple Foundation, Pt 1 - Layout 1944

Sources

  1. Educational Film Guide 1946 — title, year, creator, length, format, sound, description, catalog record