BULKHEAD: SETTING TRANSVERSE WATERTIGHT BULKHEAD INTO HULL
Sign in to track this film in your collection or want list.
Series: Shipbuilding Skills Series
Duration: 17 min
Year Published: 1942
Creator: Castle Films
Format: 16mm
Sound: Sound
Description: Produced by US Office of education. Demonstrates the work of the shipwright in setting and fairing a watertight bulkhead into a hull. Considerable emphasis is given to the location of the center line, frame lines and buttock lines on the hull of the ship, the alignment of the same lines on the bulkhead to the hull lines, the technics used in shifting the bulkhead to bring it into the correct position, and the anchoring of the bulkhead in position for fitting.
Complete Record: Series: Shipbuilding skills series Dewey number: 623.8 Audience level: sh-c-trade-adult Guide Format/cost: 16-sd-$25.17 Distributors / rental: Bell & Howell Company $25.17 rent; Wilfred Naylor; $1.50; Ohio Department of Education; University of California $1.50; A. H. Rice and Company; Calhoun Company; Sunray Films Company; Dayton Film Rental Libraries; University of Texas $2; Visual Art Films $25.17; Ideal Pictures Corporation; University System of Georgia, Division of General Extension $1
Metadata Source:Educational Film Guide 1946
No holdings listed.
Related films:
- FILING AND INSTALLING CHOCKS (1944) · Office of Education (Department of Health, Education, and Welfare)
- HOW TO CHECK AND SURFACE FOUNDATIONS (1944) · Castle Films
- LAYING OUT, DRILLING AND TAPPING FLANGES ON SEA CHEST (1944) · Castle Films
- DECK GIRDERS: SUB-ASSEMBLY (1942) · Castle Films
- PREPARING AND SETTING A KEEL BLOCK AND BOTTOM CRADLE (1942) · Castle Films
- SIDE SUB-ASSEMBLY OF A WEB FRAME (1942) · Castle Films
- MEASURING PIPE, TUBING AND FITTINGS (1944) · Office of Education (Department of Health, Education, and Welfare)
- MAKING A COLD BEND ON A HAND POWERED MACHINE (1944) · Office of Education (Department of Health, Education, and Welfare)
Record added: 2026-07-02 14:20:01