Roughing-in non-metallic sheathed cable

Duration: 24 min

Year Published: 1945

Creator: U.S. Office of Education

Format: 16mm

Sound: Sound

Description: Shows how to plan the installation of the circuit run, switch run, and wall receptacle run; how to determine the location of required runs; how to install an offset bar hanger and ceiling outlet box; how to rough-in a circuit run, using nonmetallic sheathed cable; and how to make up connections for switches, receptacles, and fixtures.

Metadata Source:Index of Training Films 1946


1 user has this film:
Indiana University Library Moving Image Archive


No related films.