On the critical path
Sign in to track this film in your collection or want list.
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the “on power” operation of the Canadian plant at Pickering, Ontario.
Credits
- Produced by
- Dennis Sawyer
Sources
- 16mm Filmography (legacy record) — title, description, catalog record
- Wikidata · Q123372315 ↗ — year, country, credits
Original permalink · Record added 2026-01-23 03:52:20