Investigation of some hand motions

Description: An analysis of the following: 1. The time required to grasp machine screws from various types of bins. 2. The time required to position pins in bushings with bevelled holes. 3. The time required to position small blocks. Silent film with English intertitles.


1 user has this film:
Australian Centre for the Moving Image


No related films.