Inspection of bombs before delivery #armyairforce
Sign in to track this film in your collection or want list.
Transcription
the Ordinance Department responsible for having the bombs at the point on time spares no effort to ensure prompt delivery the bombs are placed parallel to the fuselage under the bomb bay bombs of 100 lb and less are then loaded by hand while bombs of more than 100 lb are loaded by using the bomb platform and bomb Lift Truck at this point the air core takes over from the Ordinance Department the Bombardier or armorer supervises the actual loading beginning with an inspection it is important that All Fins are fastened securely none must be broken or bent a bomb with def
Sources
- YouTube channel: PeriscopeFilm · video ↗ — title, video
Original permalink · Record added 2025-06-22 15:57:40