Engineering At Calder Hall
Sign in to track this film in your collection or want list.
Presents a record of the building of the first pressure vessel at Calder Hall, including lifting the sections into position, welding, cutting the holes for the charge tube stubs, stress relieving, testing, lagging and preparations for installing the graphite core.
Related films
Sources
- 16mm Filmography (legacy record) — title, year, creator, format, sound, description, catalog record
Original permalink · Record added 2023-02-27 02:24:01