Engineering At Calder Hall

Presents a record of the building of the first pressure vessel at Calder Hall, including lifting the sections into position, welding, cutting the holes for the charge tube stubs, stress relieving, testing, lagging and preparations for installing the graphite core.

Related films

Sources

  1. 16mm Filmography (legacy record) — title, year, creator, format, sound, description, catalog record