Design for Correction
Sign in to track this film in your collection or want list.
Creator: A/V Geeks 16mm Films
Description:
We digitized and uploaded this film from the Prelinger Archive. Email us at footage@avgeeks.com if you have questions about the footage and are interested in using it in your project.
Complete Record: We digitized and uploaded this film from the Prelinger Archive. Email us at footage@avgeeks.com if you have questions about the footage and are interested in using it in your project.
Transcription
[Music] [Music] for many years the Federal Bureau of Prisons has been concerned about the problems presented by its heterogeneous prison population young men old men the hardened criminal the occasional offender these are some of the inmates of our federal prisons our federal system of prisons includes Penitentiary's reformatories prison camps and other types of institutions which help to separate the different types of offenders but even with these diverse institutions our federal penitentiaries contain both the determines repeater and the improvable offender in this last category are the young criminals the tough men in their twenties capable of any crime but also capable of dramatic changes therefore to separate these young adult offenders from the older long timers in the population of our penitentiaries the bureau begins to plan a new type of penitentiary for our federal prison system first the area must be chosen and the population center of the United States near the junction of Missouri Illinois Tennessee and Kentucky is selected the exact location for the special penitentiary is based on a complete list of criteria which include site size terrain characteristics availability of utilities transportation facilities and community factors replies from 114 communities responding to the formal press release of the Department of Justice initiate 50 location studies by two-man teams an architect and a prison administrator after a two-year search a location is selected which meets all of the exacting requirements the Crab Orchard Wildlife Refuge near Marion Illinois this land already belongs to the government only an interagency transfer is necessary no federal penitentiary has ever been designed specifically for maximum security and the most recent construction of a federal penitentiary was a Terre Haute Indiana in 1939 architectural firms within a 150 mile radius of marion illinois are invited to present a portfolio of their previous projects these are reviewed to find a company with an outstanding record the st. Louis firm of Hellmuth Obata and Kassebaum is eventually selected because of its worldwide experience with creative architecture hok is then instructed by bureau director James Bennett to develop a fresh approach to present design we want you to understand first of all that this institution is to be an entirely different type of institution from the traditional massive cellblock type of institution that has characterized the American prison system for years and my judgment is handicapped the individualized treatment of the offender we want develops an architectural program with hok program outlines the spatial requirements and stresses the need for an aesthetically pleasing environment that will lead the entire correctional process using this detailed program hundreds of sketches are drawn a wagon wheel arrangement receives a good response but this evolves into a more feasible plan which can easily be expanded gone or the massive tiered cell blocks in their place two-story buildings served by raised corridors a split-level design eliminated are the long corridors reminiscent of the old-style prison architecture the ultimate development is a pen wheel arrangement utilizing the central control point after every specification is tested against the goals of the institution the final plans are drawn and approved [Applause] the fire station garage warehouse administration and powerplant buildings are located outside the security fence away from all in main activities each area has a distinct function and is accessible to the adjacent related spaces after the lowest bid has been accepted ground is broken and construction began in nearby Henderson Kentucky the 7-foot wide wall components are beginning to take shape after a considerable amount of experimentation and research precasting the walls face down proves to be a most logical and economical step and the first layer of exposed point quartz will make a visually pleasing exterior [Music] intention from the prestressed cables the panels themselves become strong structural members capable of supporting the roof precast concrete provides a simple type of construction and at the same time is a strong material difficult to penetrate together with one in one-half inches of plastic foam insulation the precast wall section forms both the inside and outside wall in one sandwiched piece this will create a comfortable inside temperature a factor in maintaining and mate morale [Music] the inner wall of smooth concrete has a hard durable finish after curing overnight [Music] when finished these modular units are handsome multi-purpose components with light-colored appealing walls the architect has achieved a visual unity through the choice and utilization of construction materials in Merriam the haunch has prepared and the tongue is finished the walls are ready to be set in place during one day the shell of a new building arises [Music] connecting each of the buildings or the wide raised corridors emanating from the central control point the area under the corridors is for utilities supply and access utility spaces are also designed at the rear of inside cells [Music] the TT route sections are also pre-stressed precast units fabricated in Henderson Kentucky the tension cables are depressed in the process the cheves the desired structural camber upon completion [Music] due to their wide expanse the roof of the auditorium and dining hall proves to be an unsatisfactory place for using the precast TT system here concrete roof beams are formed after being poured in place the rods and the beams are tensioned and held in position of a desired tension the surrounding space is then pressure filled air prefabrication is on economic --all as in the case of certain high walls and floor slabs pouring in places necessary [Applause] [Music] maximum-security areas such as the maximum detention cells are constructed with smooth hardest steel concrete walls with heavy steel fixtures whereas some of the less secure areas such as the vocational shops are economically partitioned with standard concrete block construction during every phase inspectors from the Bureau check each inch of construction for the slightest flaw this continuing quality control detects any imperfection prior to completion a new type of window is designed which is not reminiscent of steel bars the security frame is welded to plates embedded in the precast panel an appealing lewbert window hides the steel cross members [Music] natural light is used to its best advantage through the employment of skylights in the library auditorium and dining hall these together with the many courtyards will give the inhabitants appealing of light airy surroundings minimum security and mates arrive from other institutions to form a completion camp they will do painting landscaping and as the other finishing touches prior to the designation of this penitentiary as maximum security the various cells are planned to handle all types of treatment and behavior and the surroundings are designed to aid correction without sacrificing security [Music] CEL interiors are designed with the human qualities in mind and are equipped with special facilities which are both pleasing and functional [Music] light and shadow having been carefully considered during the design of this institution are used to create changing patterns on the walls of the buildings giving an ever-changing view [Music] [Applause] our own Chapel is designed for the rotating altar so the Protestant or Roman Catholic services can be held at any time the hospital and psychiatric unit are constructed to provide the most modern facilities the combination auditorium gymnasium also provides recreational opportunities to aid in the overall correctional process so does the complete library which contains books on a wide range of subjects the environmental planning of all facilities is designed to provide the right atmosphere to make these young men receptive to the correctional process switches wire cables condiment tubes lenses all combined to create an elaborate network of communication and control facilities these new systems are tested checked and approved from other institutions inmates are beginning to be transferred now the hard job starts the correctional process the attempt to rehabilitate the worst of young adult offenders but as in this group that the most dramatic changes can occur and here at the new federal penitentiary at Marion Illinois the buildings are ready the fresh environment has been designed and created time will prove its effectiveness [Music]
Online Copy: https://www.youtube.com/watch?v=Hf-cxtGPphA
Metadata Source:YouTube
1 user has this film:
Prelinger Archives
No related films.
Original permalink · Record added: 2025-05-17 01:01:57