| 1941 |
Dead Reckoning: Air |
U.S. Department of the Navy, (Navigation Series) Ground track, track,wind effect, correction angle, drift angle, establishment of wind direction and velocity by grid method and drift method. College level. (MN 83-j; minutes) Dead Reckoning, Plotting, and Celestial Lines of Position. Parts 1 and 2 U.S. Department of the Navy, (Navigation Series) Basic plan of Mark III board,animating a small scale problem as it is worked out on the board; geographic position and solution of wind problem. College level. (MN 83-g; minutes) December 7th U.S. Department of the Navy, Destruction of planes, hangars, ships, loss of lives and salvaging of some of the battle scarred ships after the attack of the Japanese on December 7 |
|
16mm |
|
|
| 1941 |
Soldering So |
U.S. Department of the Navy |
72 frames |
Filmstrip |
|
|
| 1942 |
254 U.S. GOVERN |
How to Remove and Reinstall Radio Equipment LM-RU-GF-DU U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
286 U. S. |
Sand Bag Bumping U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
292 U. S. GOVERN |
Spray-Painting Equipment U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
300 U. S. GOVE |
5372-e; 40 frames, color, synchronized disc, 10 minutes) Weather U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Air Ocean |
U.S. Department of the Navy |
70 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 2: Maintenance |
and Repair U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1942 |
Beaching and Launching VP Boats |
U.S. Department of the Navy |
64 frames |
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Pan 1 U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Part 2 U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 1 |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 2 |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Capacitive Reactance |
U.S. Department of the Navy |
29 frames |
Filmstrip |
|
|
| 1942 |
Checking Valves |
U.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
Cold Weather Starting |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Common Emergencies. Part 1 |
U.S. Department of the Navy |
59 frames |
Filmstrip |
|
|
| 1942 |
Corrosion |
U.S. Department of the Navy |
33 frames |
Filmstrip |
|
|
| 1942 |
Covering With Fabric tary |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
Draw Bench Operations |
U.S. Department of the Navy |
54 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 1 |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 2 |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Engine Instruments |
U.S. Department of the Navy |
60 frames |
Filmstrip |
|
|
| 1942 |
Forming Outside and Inside Flanges c |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1942 |
Fueling Seaplanes |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Getting Ready to Instruct |
U.S. Department of the Navy |
94 frames |
Filmstrip |
|
|
| 1942 |
Good Form at Key and Phones |
U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
GOVERNMENT FILMS |
nized Forces in Flight U.S. Department of the Navy |
72 frames |
Filmstrip |
|
|
| 1942 |
Grill |
Form Blocks and Forming Re- U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Hydraulic Mechanisms |
U.S. Department of the Navy |
50 frames |
Filmstrip |
|
|
| 1942 |
Induction System Icing |
U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Inspecting the External Fuel System. |
Part 1 U.S. Department of the Navy |
36 frames |
Filmstrip |
|
|
| 1942 |
Introduction. Parts 1 and 2 |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1942 |
Maintenance of Storage Batteries |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Make Your Chalk Talk |
U.S. Department of the Navy |
56 frames |
Filmstrip |
|
|
| 1942 |
Measuring Electrical Units. Part 2 |
U.S. Department of the Navy |
38 frames |
Filmstrip |
|
|
| 1942 |
Methods of Starting the Engine |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Minor Injuries |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
Oral Hygiene |
U.S. Department of the Navy |
10 min |
16mm |
|
Silent |
| 1942 |
Plane Performance |
U.S. Department of the Navy |
63 frames |
Filmstrip |
|
|
| 1942 |
Plastic Surgery of the Hand |
U.S. Department of the Navy, Cases of traumatic surgery of hand and elective surgery in hand reconstruction; how to restore function. (MN 6128-a; 12 minutes, color) The Platoon U.S. Department of the Navy |
12 min |
16mm |
Color |
|
| 1942 |
Poison |
U.S.Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Preparation for Fabric Covering |
U.S. Department of the Navy |
40 frames |
Filmstrip |
|
|
| 1942 |
Protection of Metals. Part 1 |
U.S.Department of the Navy |
53 frames |
Filmstrip |
|
|
| 1942 |
Purpose of First Aid |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1942 |
Radio and Control |
U.S. Department of the Navy |
5 frames |
Filmstrip |
|
|
| 1942 |
Repairing Channels and Stringers |
U.S. Department of the Navy |
69 frames |
Filmstrip |
|
|
| 1942 |
Shock |
U.S. Department of the Navy |
29 frames |
Filmstrip |
|
|