| 1944 |
Film Communique No. 12: Weapons |
of War U.S. Department of the Army |
20 min |
16mm |
|
|
| 1944 |
Film Communique No. 13: Back |
Door to Japan U.S. Department of the Army |
17 min |
16mm |
|
|
| 1944 |
Fine Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of U. S. Department of the Navy |
44 frames |
Filmstrip |
|
|
| 1944 |
First Aid for Non-Battle Injuries |
U.S. Department of the Army |
29 min |
16mm |
|
|
| 1944 |
Fore Poppets and Internal Shoring |
Construction U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Forging a Deck Socket Wrench |
U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1944 |
Fundamentals of Artillery Weapons. |
Part 2: Types and Components of Carriage U.S. Department of the Army |
|
16mm |
|
|
| 1944 |
General Motors Diesel Engine Unit |
Injectors: Disassembly and Reassembly Model 278 U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
General Motors Diesel Engine Unit |
Injector: Maintenance U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
The Elliott-Buchi Turbocharger for Diesel Engines: Disassembly same U.S. Department of the Navy |
20 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Engine Reassembly. Part 2 U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
GOVERNMENT FILMS |
Reconditioning Convalescents for Return to Duty U.S. Department of the Army |
37 min |
16mm |
|
|
| 1944 |
Griscom-Russell, How It Works. Part |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1944 |
Hatch Canopy. Part 2: Layout |
U.S. Department of the Navy |
25 min |
16mm |
|
|
| 1944 |
How To Fly the B-25 |
U.S. Department of the Air Force |
|
16mm |
|
|
| 1944 |
Inspection Method. Part 2 |
U.S. Department of the Navy with cooperation of U.S. Office of Education |
|
16mm |
|
|
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
58 frames |
Filmstrip |
|
|
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
58 frames |
Filmstrip |
|
|
| 1944 |
Instrument Flight Rules |
U.S. Department of the Navy |
37 frames |
Filmstrip |
|
|
| 1944 |
Introduction to Valves |
U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1944 |
Lighting Off |
U.S. Department of the Navy |
39 min |
16mm |
|
|
| 1944 |
Loran: Airborne Operations |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Making a Hot Bend |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Making a Hot Bend |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1944 |
Mechanical Refrigeration: Control |
Mechanisms, Freon Systems U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1944 |
Mechanical Refrigeration: Operating |
Practices, Freon Systems U.S. Department of the Navy |
148 frames |
Filmstrip |
|
|
| 1944 |
Mechanical Refrigeration: Trouble |
Shooting, Freon Systems U.S. Department of the Navy |
60 frames |
Filmstrip |
|
|
| 1944 |
Men of Fire: Forgings and Castings |
U.S. Department of the Army |
|
16mm |
|
|
| 1944 |
Milling a Foundation |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Navigation Series. |
Celestial Sphere and Time No. 2) Con- 412; cept of celestial sphere; definition of terms in celestial navigation. (FS 1-203; 41 53 frames) Centering, Edge Grinding, and Beveling: Spherical Surfaces U.S. Office of Education with the co- 48 operation of the U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1944 |
Necessity for Navy yard workers to wear |
goggles to prevent blindness from accidents. (MN 1921-f; 14 minutes) To the Ladies U.S. Department of Army |
14 min |
16mm |
|
|
| 1944 |
NT FILMS |
Preflight Procedure U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1944 |
O Emprego do Suporte Fixo |
U.S. Office of Education in cooperation with U.S. Office of the Coordinator of Inter- American Affairs, (Trabalho 1945. de oficina mecanica. Usos do tomo de precisao) Portuguese version of "Using a Steady Rest." Spanish version "El Uso del Soporte Fijo", also available. 62-Port.; 25 minutes) 32, Empress of Ireland-Storstad Incident U.S. Department of the Navy, (Rules of the Nautical Road Se Title self-explanatory. (MN 202-w; minutes) Endfeed Grinding a Tapered Pin U.S. Office of Education |
|
16mm |
|
|
| 1944 |
Pact Typhus in Naples |
U.S. Department of the Navy |
11 min |
16mm |
Color |
|
| 1944 |
Painting Ships Bottoms: Hot and |
Cold Plastic; Anti-Fouling Paint U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1944 |
Placing Sliding Ways |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Preflight Procedure |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1944 |
Principles of Operation (AN/ARN-1) |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1944 |
Rain On The Plains |
U.S. Department of Agriculture |
9 min |
16mm |
|
sound |
| 1944 |
Relative Movement. Part 1: Relative |
Movement and Interception: Air U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Relative Movement. Part 2: Out and |
In Search: Relative Wind U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1944 |
Removal and Replacement of Main |
Bearings U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Cylinder Liner |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Injection Nozzles, Etc. |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Replacement of Cylinder Liner |
U.S. Department of the Navy |
27 min |
16mm |
|
|
| 1944 |
Replacement of Injection Nozzles, |
Etc. U.S. Department of the Navy |
6 min |
16mm |
|
|
| 1944 |
Replacement of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Rough Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of the U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1944 |
Safety for Welders: Use of Welding |
Protective Equipment U.S. Department of the Navy |
7 min |
16mm |
|
|