| 1942 |
Cable Splicing. Part 1 |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 2 |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Call Of The Canyon. |
Republic Pictures Corporation |
7 reels |
16mm |
B&W |
sound |
| 1942 |
Capacitive Reactance |
U.S. Department of the Navy |
29 frames |
Filmstrip |
|
|
| 1942 |
Career possibilities for scientists, |
nicians, administrators, and other collegetrained personnel in the varied activities of the U.S. Department of Agriculture. 24 minutes, color) The Deck: Setting a Web Frame and a Transverse Beam U.S. Office of Education |
|
16mm |
|
|
| 1942 |
Chandelles |
U.S. Department of the Air Force |
7 min |
16mm |
|
|
| 1942 |
Checking Valves |
U.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
CITY OF ROME INCIDENT |
Department of the Navy (Department of Defense) |
5 min |
|
Color |
Optical sound |
| 1942 |
Cold Weather Starting |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Collecting And Reporting Enemy Information by Fighter Pilots ▶ |
The Signal Corps |
17 min. |
|
B&W |
sound |
| 1942 |
Common Emergencies. Part 1 |
U.S. Department of the Navy |
59 frames |
Filmstrip |
|
|
| 1942 |
Conquer By The Clock (1942, sound) ▶ |
frederic-ullman-jr-rko-pathe-and-war-activities-committee-of-the-motion-picture-industry |
|
|
B&W |
sound |
| 1942 |
Construction and Types |
U.S. Department of the Air Force |
10 min |
16mm |
|
|
| 1942 |
Control Surfaces |
U.S. Department of the Air Force |
7 min |
16mm |
|
|
| 1942 |
COPPERSMITH, THE - FLARING AND REDUCING |
Department of the Navy (Department of Defense) |
20 min |
|
B&W |
Optical sound |
| 1942 |
Corrosion |
U.S. Department of the Navy |
33 frames |
Filmstrip |
|
|
| 1942 |
Covering With Fabric tary |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
CTURES 169 |
Servicing the Aviation Spark Plug U.S. Department of the Air Force |
23 min |
16mm |
|
|
| 1942 |
Curtiss Electric, Disassembling the |
Power Unit U.S. Department of the Air Force |
25 min |
16mm |
|
|
| 1942 |
Cylinder and Piston Assemblies |
U.S. Department of the Air Force |
32 frames |
Filmstrip |
|
|
| 1942 |
De-Icing Equipment |
U.S. Department of the Air Force |
41 frames |
Filmstrip |
|
|
| 1942 |
DIESEL ENGINE, THE |
Department of the Navy (Department of Defense) |
29 min |
|
B&W |
Optical sound |
| 1942 |
DISASSEMBLY OF THE B-268A ENGINE |
Department of the Navy (Department of Defense) |
27 min |
|
B&W |
Optical sound |
| 1942 |
Draw Bench Operations |
U.S. Department of the Navy |
54 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 1 |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 2 |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Effective Study Methods |
U.S. Department of the Air Force |
43 frames |
Filmstrip |
|
|
| 1942 |
Elements Of Electricity |
The Pentagon |
450 |
16mm |
B&W |
sound |
| 1942 |
Enemy X |
Arnold Eagle Productions |
14 min |
16mm |
B&W |
sound |
| 1942 |
Engine Instruments |
U.S. Department of the Navy |
60 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) How to treat skull, |
ose, jaw, spine, rib, pelvis, thigh, kneeap, foot, toe fractures. Five general aid rules. irst Straight photography and rawings. (SN 223-6; 55 frames, synhronized disc, 13 minutes) ractures. Part 3.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) Two principal types |
f fractures; how to treat leg, forearm, pper arm, elbow, finger, and collarbone ractures. Straight photography and rawings. (SN 223-a; 55 frames t synhronized disc, 12 minutes) ractures. Part 2.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
FIRST IMPRESSIONS ▶ |
Department of the Navy (Department of Defense) |
21 min |
16mm |
B&W |
Optical sound |
| 1942 |
FIRST IMPRESSIONS (SPANISH) |
Department of the Navy (Department of Defense) |
21 min |
|
B&W |
Optical sound |
| 1942 |
Folding and Packing the Se |
Seat Parachute U.S. Department of the Air Force |
|
16mm |
|
|
| 1942 |
Formation Flying: Basic |
U.S. Department of the Air Force |
|
16mm |
|
|
| 1942 |
Forming Outside and Inside Flanges c |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1942 |
Fuel Level Gages |
U.S. Department of the Air Force |
41 frames |
Filmstrip |
|
|
| 1942 |
Fueling Seaplanes |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Generator and Regulator Systems: |
Principles U.S. Department of the Air Force |
65 frames |
Filmstrip |
|
|
| 1942 |
Getting Ready to Instruct |
U.S. Department of the Navy |
94 frames |
Filmstrip |
|
|
| 1942 |
Good Form at Key and Phones |
U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
GOVERNMENT FILMS |
aerial navigation; utilization of weather reports, radio compasses, directional an- (OE tenna, and automatic compass. (TF l- 327; 30 minutes) 2, 41 7 Radio Antennas: Creation and Be- 1943. havior of Radio Waves Series) U.S. Department of the Air Force |
|
16mm |
|
|
| 1942 |
GOVERNMENT FILMS |
nized Forces in Flight U.S. Department of the Navy |
72 frames |
Filmstrip |
|
|
| 1942 |
Grill |
Form Blocks and Forming Re- U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Ground Adjustable Propellers |
U.S. Department of the Air Force |
55 frames |
Filmstrip |
|
|
| 1942 |
Hamilton Constant Speed, Removal |
and Disassembly U.S. Department of the Air Force |
|
16mm |
|
|
| 1942 |
Hamilton Hydromatic, Reassembly |
and Adjustment. Parts 1 and 2 U.S. Department of the Air Force |
44 min |
16mm |
|
|
| 1942 |
Hamilton Hydromatic, Servicing |
U.S. Department of the Air Force |
8 min |
16mm |
|
|
| 1942 |
Hamilton Hydromatic, Theory and |
Operation U.S. Department of the Air Force |
|
16mm |
|
|