| 1944 |
INSTALLING VALVES AND STRAINER ON SEA CHEST |
Office of Education (Department of Health, Education, and Welfare) |
12 min |
16mm |
B&W |
Optical sound |
| 1944 |
INSTALLING VITREOUS FIXTURES |
Office of Education (Department of Health, Education, and Welfare) |
19 min |
16mm |
B&W |
Optical sound |
| 1944 |
Instructing the Blind Worker on the Job |
Castle Films | United States Office of Education |
0:22:00 |
16mm |
B&W |
sound |
| 1944 |
Instructing the Worker on the Job |
United States Office of Education |
22 |
16mm |
B&W |
|
| 1944 |
INSTRUCTING THE WORKER ON THE JOB |
Office of Education (Department of Health, Education, and Welfare) |
14 min |
|
B&W |
Optical sound |
| 1944 |
INSTRUCTING THE WORKER ON THE JOB (SPANISH) |
Office of Education (Department of Health, Education, and Welfare) |
14 min |
|
B&W |
Optical sound |
| 1944 |
Jointing Edges and Ends 90 Degrees to Face |
United States Office of Education |
0:22:00 |
16mm |
B&W |
sound |
| 1944 |
LAYING OFF BULKHEADS |
Office of Education (Department of Health, Education, and Welfare) |
15 min |
|
B&W |
Optical sound |
| 1944 |
LAYING OUT AND FORMING PLYWOOD |
Office of Education (Department of Health, Education, and Welfare) |
21 min |
16mm |
B&W |
Optical sound |
| 1944 |
LAYING OUT AND INSTALLING HANGERS |
Office of Education (Department of Health, Education, and Welfare) |
19 min |
16mm |
B&W |
Optical sound |
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 2: Laying Off Bulkheads U.S. Office of Education |
15 min |
16mm |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 1: Running a Temporary Line U.S. Office of Education |
32 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 2: Laying Off Bulkheads U.S. Office of Education |
25 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern |
Tube, Tail Shaft, and Propeller. Part 4: Fitting Tube, Shaft, and Propeller U.S. Office of Education |
58 frames |
Filmstrip |
|
|
| 1944 |
Laying Out and Installing Stern Tube, Tail Shaft, and Propeller. Part 3: Running a Permanent Line and Boring |
U.S. Office of Education |
32 min |
16mm |
|
|
| 1944 |
LAYING OUT, DRILLING AND TAPPING FLANGES ON SEA CHEST |
Office of Education (Department of Health, Education, and Welfare) |
19 min |
|
B&W |
Optical sound |
| 1944 |
Laying Out, Drilling, and Tapping |
Flanges on Sea Chest U.S. Office of Education |
28 frames |
Filmstrip |
|
|
| 1944 |
Machine Shop Work - infeed grinding a shaft of two diameters |
United States. Office of Education. |
|
|
|
|
| 1944 |
Machinery |
U.S. Office of Education |
42 frames |
Filmstrip |
|
|
| 1944 |
Machinery |
U.S. Office of Education |
42 frames |
Filmstrip |
|
|
| 1944 |
Maintaining Good Working Conditions |
United States Office of Education |
|
16mm |
|
sound |
| 1944 |
MAINTAINING GOOD WORKING CONDITIONS |
Office of Education (Department of Health, Education, and Welfare) |
9 min |
|
B&W |
Optical sound |
| 1944 |
MAINTAINING GOOD WORKING CONDITIONS (SPANISH) |
Office of Education (Department of Health, Education, and Welfare) |
9 min |
|
B&W |
Optical sound |
| 1944 |
MAINTAINING QUALITY STANDARDS |
U.S. Office of Education |
10 min |
16mm |
B&W |
Sound |
| 1944 |
MAINTAINING QUALITY STANDARDS (SPANISH) |
Office of Education (Department of Health, Education, and Welfare) |
10 min |
|
B&W |
Optical sound |
| 1944 |
Maintaining Workers' Interest |
United States Office of Education |
|
16mm |
B&W |
|
| 1944 |
MAINTAINING WORKERS' INTEREST (SPANISH) |
Office of Education (Department of Health, Education, and Welfare) |
13 min |
|
B&W |
Optical sound |
| 1944 |
Maintaining Workers’ Interest |
U S Office Of Education |
400 ft. |
|
|
|
| 1944 |
MAKING A COLD BEND ON A HAND POWERED MACHINE |
Office of Education (Department of Health, Education, and Welfare) |
13 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING A FIVE TUCK SPLICE |
Office of Education (Department of Health, Education, and Welfare) |
26 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING A MASTER CONTOUR TEMPLATE |
Office of Education (Department of Health, Education, and Welfare) |
18 min |
Filmstrip |
B&W |
Optical sound |
| 1944 |
MAKING A MASTER DEVELOPED LAYOUT, AND MAKING THE FORM BLOCK, PT 2 |
Office of Education (Department of Health, Education, and Welfare) |
16 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING A MASTER DEVELOPED LAYOUT, PT 1 |
Office of Education (Department of Health, Education, and Welfare) |
20 min |
|
B&W |
Optical sound |
| 1944 |
MAKING A MATCHBOARD PATTERN |
Office of Education (Department of Health, Education, and Welfare) |
21 min |
16mm |
B&W |
Optical sound |
| 1944 |
Making a One Piece Flat Pattern |
Office of Education (Department of Health, Education, and Welfare) |
22 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING A PATTERN FOR A FLANGED PIPE ELBOW |
Office of Education (Department of Health, Education, and Welfare) |
18 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING A PATTERN FOR A THREE-PART MOLD |
Office of Education (Department of Health, Education, and Welfare) |
20 min |
|
B&W |
Optical sound |
| 1944 |
MAKING A WRAPPED AND SOLDERED SPLICE |
Office of Education (Department of Health, Education, and Welfare) |
18 min |
16mm |
B&W |
Optical sound |
| 1944 |
MAKING AND REPAIRING TUBING CONNECTIONS |
Office of Education (Department of Health, Education, and Welfare) |
18 min |
16mm |
B&W |
Optical sound |
| 1944 |
Manual Cutting A Bevel—Freehand. |
Office of Education (Department of Health, Education, and Welfare) |
1 reel |
|
B&W |
Optical sound |
| 1944 |
MANUAL CUTTING A SHAPE - FREEHAND GUIDED |
Office of Education (Department of Health, Education, and Welfare) |
16 min |
16mm |
B&W |
Optical sound |
| 1944 |
Manual Cutting To A Line—Freehand. |
Office of Education (Department of Health, Education, and Welfare) |
1 reel |
Filmstrip |
B&W |
Optical sound |
| 1944 |
MEASUREMENT WITH LIGHT WAVES |
Office of Education (Department of Health, Education, and Welfare) |
15 min |
|
B&W |
Optical sound |
| 1944 |
MEASURING PIPE, TUBING AND FITTINGS |
Office of Education (Department of Health, Education, and Welfare) |
5 min |
16mm |
B&W |
Optical sound |
| 1944 |
MILLING A CIRCULAR T-SLOT |
Office of Education (Department of Health, Education, and Welfare) |
22 min |
16mm |
B&W |
Optical sound |
| 1944 |
MILLING A TEMPLATE |
Office of Education (Department of Health, Education, and Welfare) |
17 min |
16mm |
B&W |
Optical sound |
| 1944 |
Molding with a gated pattern |
Office of Education (Department of Health, Education, and Welfare) |
11 min |
16mm |
B&W |
Optical sound |
| 1944 |
Molding with a loose pattern |
United States Office of Education |
22 |
16mm |
B&W |
Optical sound |
| 1944 |
MOLDING WITH A SPLIT PATTERN |
Office of Education (Department of Health, Education, and Welfare) |
19 min |
16mm |
B&W |
Optical sound |
| 1944 |
Navigation Series. |
Celestial Sphere and Time No. 2) Con- 412; cept of celestial sphere; definition of terms in celestial navigation. (FS 1-203; 41 53 frames) Centering, Edge Grinding, and Beveling: Spherical Surfaces U.S. Office of Education with the co- 48 operation of the U.S. Department of the Navy |
|
Filmstrip |
|
|