| 1943 |
Treatment of Jaw Fractures |
U.S. Department of the Navy |
25 min |
16mm |
Color |
Silent |
| 1943 |
VARANGER-DORA WEEMS INCIDENT, THE |
Department of the Navy (Department of Defense) |
4 min |
|
B&W |
Optical sound |
| 1943 |
Watertight Cover. Part 2: Assembly |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 1 U.S. Department of the Navy |
101 frames |
Filmstrip |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 2 U.S. Department of the Navy |
78 frames |
Filmstrip |
|
|
| 1943 |
Wounds |
U.S. Department of the Navy |
20 min |
16mm |
Color |
|
| 1942 |
254 U.S. GOVERN |
How to Remove and Reinstall Radio Equipment LM-RU-GF-DU U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
286 U. S. |
Sand Bag Bumping U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
292 U. S. GOVERN |
Spray-Painting Equipment U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
300 U. S. GOVE |
5372-e; 40 frames, color, synchronized disc, 10 minutes) Weather U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Air Ocean |
U.S. Department of the Navy |
70 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 2: Maintenance |
and Repair U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1942 |
ASTRONOMICAL TRIANGLE, THE |
Department of the Navy (Department of Defense) |
37 min |
|
B&W |
Optical sound |
| 1942 |
AUDIO FREQUENCY AMPLIFICATION |
Department of the Navy (Department of Defense) |
25 min |
Filmstrip |
B&W |
Optical sound |
| 1942 |
Beaching and Launching VP Boats |
U.S. Department of the Navy |
64 frames |
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Pan 1 U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Part 2 U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 1 |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 2 |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Capacitive Reactance |
U.S. Department of the Navy |
29 frames |
Filmstrip |
|
|
| 1942 |
Checking Valves |
U.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
CITY OF ROME INCIDENT |
Department of the Navy (Department of Defense) |
5 min |
|
Color |
Optical sound |
| 1942 |
Cold Weather Starting |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Common Emergencies. Part 1 |
U.S. Department of the Navy |
59 frames |
Filmstrip |
|
|
| 1942 |
COPPERSMITH, THE - FLARING AND REDUCING |
Department of the Navy (Department of Defense) |
20 min |
|
B&W |
Optical sound |
| 1942 |
Corrosion |
U.S. Department of the Navy |
33 frames |
Filmstrip |
|
|
| 1942 |
Covering With Fabric tary |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
DIESEL ENGINE, THE |
Department of the Navy (Department of Defense) |
29 min |
|
B&W |
Optical sound |
| 1942 |
DISASSEMBLY OF THE B-268A ENGINE |
Department of the Navy (Department of Defense) |
27 min |
|
B&W |
Optical sound |
| 1942 |
Draw Bench Operations |
U.S. Department of the Navy |
54 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 1 |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 2 |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Engine Instruments |
U.S. Department of the Navy |
60 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) How to treat skull, |
ose, jaw, spine, rib, pelvis, thigh, kneeap, foot, toe fractures. Five general aid rules. irst Straight photography and rawings. (SN 223-6; 55 frames, synhronized disc, 13 minutes) ractures. Part 3.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) Two principal types |
f fractures; how to treat leg, forearm, pper arm, elbow, finger, and collarbone ractures. Straight photography and rawings. (SN 223-a; 55 frames t synhronized disc, 12 minutes) ractures. Part 2.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
FIRST IMPRESSIONS |
Department of the Navy (Department of Defense) |
21 min |
16mm |
B&W |
Optical sound |
| 1942 |
FIRST IMPRESSIONS (SPANISH) |
Department of the Navy (Department of Defense) |
21 min |
|
B&W |
Optical sound |
| 1942 |
Forming Outside and Inside Flanges c |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1942 |
Fueling Seaplanes |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Getting Ready to Instruct |
U.S. Department of the Navy |
94 frames |
Filmstrip |
|
|
| 1942 |
Good Form at Key and Phones |
U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
GOVERNMENT FILMS |
nized Forces in Flight U.S. Department of the Navy |
72 frames |
Filmstrip |
|
|
| 1942 |
Grill |
Form Blocks and Forming Re- U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Hydraulic Mechanisms |
U.S. Department of the Navy |
50 frames |
Filmstrip |
|
|
| 1942 |
Induction System Icing |
U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Inspecting the External Fuel System. |
Part 1 U.S. Department of the Navy |
36 frames |
Filmstrip |
|
|
| 1942 |
Introduction. Parts 1 and 2 |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1942 |
Maintenance of Storage Batteries |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|