Department of the Navy

Looking up Department of the Navy on Wikipedia…

Filmography in the catalog

Credited on 636 films (1941–1988) — matched by name in the Creator or Credits field. Also mentioned in 117 other records (descriptions, transcriptions, copyright notes).

Year ▲ Title CreatorLengthFormatColorSound
1944 Replacement of Injection Nozzles, Etc. U.S. Department of the Navy 6 min 16mm
1944 Replacement of Pistons U.S. Department of the Navy 16mm
1944 RIGGING BLOCKS Department of the Navy (Department of Defense) 11 min 16mm B&W Optical sound
1944 RIGID AND SWINGING STAGING Department of the Navy (Department of Defense) 18 min B&W Optical sound
1944 ROUGH GRINDING WITH A CURVATURE GENERATOR Department of the Navy (Department of Defense) 15 min B&W Optical sound
1944 Rough Grinding: Spherical Surfaces U.S. Office of Education with the cooperation of the U.S. Department of the Navy 57 frames Filmstrip
1944 Safety for Welders: Use of Welding Protective Equipment U.S. Department of the Navy 7 min 16mm
1944 Safety in Navy Yards U.S. Department of the Navy 16mm
1944 SERIES AND PARALLEL CIRCUITS Department of the Navy (Department of Defense) 8 min B&W Optical sound
1944 Skills Series. Sheetmetal (Shipbuilding Work) Triangulation method in development of a pattern from making blueprint to full scale plan; cutting the metal; dressing; hammering; and checking for squareness. Supplementary filmstrip, same title, also available. (MN 2339-d; 17 filmminutes) (OE 41 2, 41 Transmission Security U.S. Department of the Navy 16mm
1944 SLINGING LOAD Department of the Navy (Department of Defense) 17 min 16mm B&W Optical sound
1944 Spherical Surfaces k U.S. Office of Education, with the cooperation of the U.S. Department of the Navy 27 min 16mm Sound
1944 STORY OF THE BLACK CATS, THE Department of the Navy (Department of Defense) 19 min B&W Optical sound
1944 Superheat Control U.S. Department of the Navy, 19 (Fireroom Operation Series) How light off saturated furnace; light superheater when steam reaches 600 I increase superheat temperature; secure superheater. (MN 2356-f; minutes) Supervising Women Workers U.S. Office of Education 11 min 16mm
1944 Synchro systems. Part 1 U.S. Department of the Navy 13 min 16mm
1944 TAURUS-GULF TRADE INCIDENT, THE Department of the Navy (Department of Defense) 3 min B&W Optical sound
1944 TION PICTURES 173 Simple Foundation. Part 2: Duplication and Fabrication U.S. Department of the Navy 16 min 16mm
1944 TUBE TESTER OPERATION Department of the Navy (Department of Defense) 9 min B&W Optical sound
1944 USE AND CARE OF WIRE ROPE Department of the Navy (Department of Defense) 18 min B&W Optical sound
1944 V: Air. Part 1 U.S. Department of the Navy 15 min 16mm
1944 Watertight Cover. Part 1: Layout and Fabrication U.S. Department of the Navy 16mm
1944 Weather for the Navigator U.S. Department of the Navy 9 min 16mm
1944 Weather Map Symbols: Navy Quiz No. 44 U.S. Department of the Navy 87 frames Filmstrip
1945 Action of the Extra-Ocular Muscles U.S. Department of the Navy 8 min 16mm Color
1945 Assignment Home U.S. Department of the Navy 25 min 16mm
1945 Audio oscillator operation Department of the Navy (Department of Defense) 9 min B&W Optical sound
1945 Automobile Operation No. 5) What a driver should do to locate and correct minor car troubles; and how to recognize symptoms of impending trouble. Supplementary same title, also filmstrip, available. (OE 490; 12 minutes) 41 32, 41 The True Fade System U.S. Department of the Navy 12 min 16mm
1945 BEARINGS Department of the Navy (Department of Defense) 9 min B&W Optical sound
1945 BEARINGS Department of the Navy (Department of Defense) 11 min B&W Optical sound
1945 BEFORE YOU FLY Prodisas- U.S. Department of the Navy 35 min 16mm
1945 BENCHWORK, PT 1 Department of the Navy (Department of Defense) 14 min B&W Optical sound
1945 BENCHWORK, PT 2 Department of the Navy (Department of Defense) 19 min B&W Optical sound
1945 BENCHWORK, PT 3 Department of the Navy (Department of Defense) 12 min B&W Optical sound
1945 BENCHWORK, PT 4 Department of the Navy (Department of Defense) 26 min B&W Optical sound
1945 Benchwork. Part 1 U.S. Department of the Navy 12 min 16mm
1945 Benchwork. Part 2 U.S. Department of the Navy 19 min 16mm
1945 Benchwork. Part 3 U.S. Department of the Navy 12 min 16mm
1945 Benchwork. Part 4 U.S. Department of the Navy 16mm
1945 Care and Operation of Gun Cameras U.S. Department of the Navy 22 min 16mm
1945 Cleaning Mess Gear U.S. Department of the Navy 20 min 16mm
1945 Crash Fire Rescue U.S. Department of the Navy 16mm
1945 DAMAGE CONTROL - THE METACENTER IN STABILITY, PT 1 Department of the Navy (Department of Defense) 26 min B&W Optical sound
1945 Directional Valves U.S. Department of the Navy Filmstrip
1945 Drinking Water U.S. Department of the Navy 5 min 16mm
1945 ES 11 titudes of Flight. Part 1 S. Department of the Navy 16mm
1945 Evacuation of Casualties: Saipan U.S. Department of the Navy 23 min 16mm
1945 F 5; Signal Generator Operation U.S. Department of the Navy 9 min 16mm
1945 Field Management of Eye Injuries U.S. Department of the Navy 20 min 16mm Color
1945 Fleet That Came to Slay U.S. Department of the Navy 22 min 16mm
1945 Fore Poppets and Internal Shoring Construction U.S. Department of the Navy 75 frames Filmstrip