De-icer Servicing & Installation
Sign in to track this film in your collection or want list.
✎ Suggest a correctionShow principles of operation, installation, and servicing of the Goodrich de-icer. Building a Box Beam Spar (see Page 19). Preparation for Fabric Covering. (37 pictures-40 frames) Jam Handy. Cross rib bracing on wing structures; how to use tape on wood and steel structures; method of securing tape to ribs, taking up an anchoring; dope proofing by means of dope proof paint, cellulose tape and metal foil; fabric estimating, for fuselage, aileron structures, wings, elevators; measuring to warp of material; seam allowances, total lengths, tape required, and how to measure total lengths. Ribstitching. (47 pictures-47 frames). Jam Handy. Cutting of anti-tear strips from airplane cloth for wings; applying and doping strips; use of reinforcing tape; applying tape; stitching technique detailed step by step. Aircraft Sheet Metal Fabrication (See
Complete catalog record
Category: Aviation Industry
Subcategory: Aircraft Production
Type: Slide Film
Source: Jam Handy
Format code: si
Subcategory: Aircraft Production
Type: Slide Film
Source: Jam Handy
Format code: si
Sources
- Index of Training Films 1946 — title, creator, length, format, sound, description, catalog record
Record added 2026-07-09 22:50:35 · Suggest a correction