CONSTRUCTION OF A FIVE-UNIT BRIDGE - PONTIC PREPARATION, BRIDGE ASSEMBLY, AND
Sign in to track this film in your collection or want list.
✎ Suggest a correctionFULL TITLE--CONSTRUCTION OF A FIVE-UNIT BRIDGE - PREPARATION, BRIDGE ASSEMBLY, AND CEMENTATION. Demonstrates finalization of the five-unit bridge and includes adaptation of the pontic facings, bridge assembly, occlusal adjustment and cementation. Performed by DR Samuel Guyer, Professor and Chairman of the Department of Fixed Prosthodontics, School of Dentistry, Washington University, St Louis, Missouri.
Sources
- usgov-av-1974 — title, year, creator, length, color, sound, description
Record added 2026-07-01 03:45:39 · Suggest a correction